Under Health & Safety legislation, exhibitors and their main contractors are responsible for all activities that take place on their stand throughout the event, and any actions that could affect others not on their stand. This includes preparing risk assessments and method statements, as well as the briefing, communicating to and controlling of all the sub-contractors who work on their stand.
RenewableUK and Scottish Renewables are committed to providing, maintaining, and promoting, so far as is reasonably practicable, the highest standards of Health, Safety & Welfare at all its events. All exhibitors and contractors are expected to ensure that they provide a safe place and system of work, as is their legal duty under HSAW 1974. Successful safety management requires the commitment, involvement, and co-operation of all those on site at an event.
As part of the Association of Event Venues (AEV), P&J Live adheres to the policies within the eGuide. The eGuide brings together guidance for achieving common standards of health, safety and operational planning, management, and onsite conduct for events at all participating AEV member venues. The scope and development of the eGuide follows extensive consultation with operations professionals within the exhibition and event industry. It incorporates health, safety and operational practices that represent compliance with building regulations and health & safety legislation.
THINK about your safety and the safety of others when working on site.
PERSONAL PROTECTIVE EQUIPMENT: high visibility vests must be worn during build-up and breakdown. Please note that open-toed shoes and/or sandals will not be accepted on site during build-up and breakdown.
EMERGENCY PROCEDURES should be read and understood.
EMERGENCY GANGWAYS must remain clear at all times. Under no circumstances should any items be placed in these areas.
TRAFFIC could be moving around the hall and certainly around the loading areas. Take care when walking around the site and always ensure you are wearing high vis during build-up and breakdown days.
WORKING AT HEIGHT should only be undertaken following a proper assessment of the work involved as required by the Work at Height Regulations 2005.
HOUSEKEEPING should be a priority when working on site. This will ensure that your work does not affect others working around you, as well as keeping your general working area clean and tidy.
HEALTH AND SAFETY FLOOR MANAGERS are on site to monitor all working practices and give advice where necessary. Dangerous practices will result in a one-hour suspension from site. Continued bad practice will result in your removal from site.
SMOKING & E-CIGARETTES are not permitted within the halls at any point during the show and should only be used in the designated smoking areas externally from the halls. Cigarette end bins are available at all designated smoking areas and must be used.
HEALTH & SAFETY FORM must be completed by 12 September.
The Construction Design & Management Regulations 2015 (CDM) are the main set of regulations for managing the health, safety, and welfare of construction projects. All exhibitors must comply with CDM REGULATIONS.
CDM aims to improve health and safety in the industry by helping you to:
These regulations have been implemented to further regulate the industry and ensure that safety is the highest priority, encouraging better communication of information and standardising lines of responsibility.
When will CDM be in operation?
CDM will be in operation at times when there is construction of any kind taking place within the hall, namely during build-up and breakdown. It will not, however, be in effect when only stand dressing and aesthetic works, such as painting, are taking place.
Controls for Access into the Hall
When CDM is in operation, it is important that we control access into the hall and only allow admittance to those who have completed the Health & Safety Form. This should be completed by 12 September. There will be limited opportunities for the Site Induction to be completed on site. It is, therefore, to your advantage that this is done beforehand.
For ease of reference, please make sure that you have covered the following points amongst other safety precautions that you have identified.
Do
Don’t
For safety reasons, all gangways must be kept as clear as possible at all times. In addition, we have designated emergency gangways which may not be obstructed at any time.
Shell Scheme Exhibitors must complete and submit the Health & Safety and Risk Assessment forms, and undertake their own Risk Assessment. If you have indicated on the form that you will be participating in a high-risk activity, then you must submit further information to the Operations Team before coming on site. If you do not plan a high-risk activity, you do not need to submit a Risk Assessment but please be aware that we may ask to see documentation on site.
Space Only Exhibitors must complete and submit the Health & Safety Form. All Space Only exhibitors must submit a suitable and sufficient Risk Assessment, covering the build-up, breakdown, and open periods, with your stand plan submission. A Method Statement, Construction Phase Plan and a copy of Public Liability Insurance must also be submitted.
Contact
Exhibition Operations Team
Email: dianne.wright@inside-events.co.uk
Tel: +44 (0)2476 510015
Deadline: 12 September
Step 1: Look for the hazards: How and when will the work be done; where on the stand will each trade involved be working? What equipment, materials and chemicals will be used? How much noise and dust will there be? Where will there be vehicle movements and lifting?
Step 2: Decide who could be harmed and how: Who will be affected by your work and most at risk? Think of your employees, contractors, or exhibitors on or near your stand, through to the visitors themselves. Safe working depends on co-operation between companies on site so take this into account and consider necessary precautions on every aspect of the work being carried out.
Step 3: Evaluate the risks: Once you have done this adequately, you can decide on the appropriate action. Ask yourself (a) can the hazard or risk be removed completely or done in a different way, (b) if the risk cannot be eliminated, can it be controlled, (c) can measures be taken that will protect the entire workforce on site?
Step 4: Record the findings: Write down the findings of your Risk Assessment. Pass on information about significant risks to those people identified in Step 2 and record what measures you have taken to control those risks.
Step 5: Review your findings: This allows you to learn by experience and take account of any unusual conditions or changes that occur on site. All venues have different rules and regulations, and no two exhibitions provide the same environment. In all complex stand building cases, you or your Principal Contractor should draw up a specific Safety Method Statement.
The risk guide, in the risk assessment template below, can be used to decide if a risk falls into high, medium, or low category. This information should be stated next to each identified risk. The level of detail given in your risk assessment should be broadly proportionate to the level of risk involved.
RISK ASSESSMENT TEMPLATE
METHOD STATEMENT EXAMPLE
CONSTRUCTION PHASE PLAN TEMPLATE